Page 9 - KNT
P. 9
and deck Strength 4mt/sqm from to collect other cargoes.
shipping company called ‘H’.
At that point, it was inevitable that we
Even after specifying the lady for our come up with an ideal alternative without
“conditional” project, to satisfy the failing to benefit both parties, so made a
July of year 2014 commemorates our Though satisfying the fore-mentioned delivery and so pressured by the buyer. second condition of subject lady calling proposal that the ship-owner calls a lady
successful transportation of a cylindrical conditions was definitely possible, we at Gunsan port, the ship-owner’s at Gunsan port if the client agrees to
instrument air receiver weighing 140mt knew it would not be easy to succeed Fortunately, based on our experience minimum inducement had to be reached ready the cargoes and proceed with
to Jebel Ali, UAE. because there was less than a month of and network in this field accumulated but our subject shipment alone did not shipping later than originally planned
While designing the transport, our time allowance between the date of over decades, we were able to immedi- reach the amount. Also, it should be -–-not exceeding 15 days---- when the
client presented two conditions; first request from our client and the expected ately track and list down the ship- noted that Gunsan port accommodated rest of shipper’s cargoes are collected.
was the mother vessel to be equipped commencement date of the project while owners from all over the world who neither a heavy-industry complex nor Final agreement was made and
with heavy crane to not require usage meeting conditions to be met. There was possessed satisfactory ladies. After any manufacturing factory and due to the everyone emerged triumphant.
of additional crane and the second not ample time to search for a suitable dozens of conference and technical port’s very large tidal range, the area
condition stated that the lady calls at lady and make technical evaluation, but evaluation, we finally narrowed down to was difficult to quickly collect the enough July 3rd
Gunsan port, a capable port closest to our client was in urgent situation where a lady with Korean nationality and of volume to meet the minimum induce- 22 pkgs
the factory to minimize the overall they could not delay any longer because ment or to even wait for another Max. 141mt
logistics cost. our client was already overdue with DWT 30,000mt, Crane Capacity 320mt satisfactory lady calling at Gunsan port 3,769cbm
SEA,AIR AND LAND
KNT CARGO Co., Ltd

