Page 8 - KNT
P. 8

04












            Conditional



            & Triumphant












            There was less than a month of time allowance between the date of                                                          and deck Strength 4mt/sqm from    to collect other cargoes.
                 There was less than a month of time allowance between the date of
                our client’s first request and the date of its commencement and conditions
           our client’s first request and the date of its commencement and conditions                                                  shipping company called ‘H’.       At that point, it was inevitable that we
                given by our client still had to be met.
           given by our client still had to be met.                                                                                     Even after specifying the lady for our   come up with an ideal alternative without
                                                                                                                                       “conditional” project, to satisfy the   failing to benefit both parties, so made a
                                                                                     delivery and so pressured by the buyer.
                 July of year 2014 commemorates our  Though satisfying the fore-mentioned
            July of year 2014 commemorates our     Though satisfying the fore-mentioned delivery and so pressured by the buyer.        second condition of subject lady calling   proposal that the ship-owner calls a lady
                successful transportation of a cylindrical
           successful transportation of a cylindrical   conditions was definitely possible, we                                         at Gunsan port, the ship-owner’s   at Gunsan port if the client agrees to
                                                  conditions was definitely possible, we
           instrument air receiver weighing 140mt   knew it would not be easy to succeed   Fortunately, based on our experience        minimum inducement had to be reached   ready the cargoes and proceed with
                                                                                      Fortunately, based on our experience
                instrument air receiver weighing 140mt  knew it would not be easy to succeed
                to Jebel Ali, UAE.
                                                  because there was less than a month of  and network in this field accumulated
           to Jebel Ali, UAE.                because there was less than a month of   and network in this field accumulated            but our subject shipment alone did not   shipping later than originally planned
            While designing the transport, our    time allowance between the date of   over decades, we were able to immedi-           reach the amount. Also, it should be   -–-not exceeding 15 days---- when the
                 While designing the transport, our  time allowance between the date of
                                                                                     over decades, we were able to immedi-
                                                                                ately track and list down the ship-
           client presented two conditions; first   request from our client and the expected   ately track and list down the ship-     noted that Gunsan port accommodated   rest of shipper’s cargoes are collected.
                client presented two conditions; first request from our client and the expected
           was the mother vessel to be equipped   commencement date of the project while   owners from all over the world who          neither a heavy-industry complex nor    Final agreement was made and
                was the mother vessel to be equipped  commencement date of the project while
                                                                                owners from all over the world who
                with heavy crane to not require usage  meeting conditions to be met. There was
           with heavy crane to not require usage   meeting conditions to be met. There was   possessed satisfactory ladies. After      any manufacturing factory and due to the   everyone emerged triumphant.
                                                                                possessed satisfactory ladies. After
                of additional crane and the second
           of additional crane and the second   not ample time to search for a suitable   dozens of conference and technical           port’s very large tidal range, the area
                                                  not ample time to search for a suitable  dozens of conference and technical
           condition stated that the lady calls at   lady and make technical evaluation, but  evaluation, we finally narrowed down to   was difficult to quickly collect the enough   July 3rd
                                                                                     evaluation, we finally narrowed down to
                condition stated that the lady calls at  lady and make technical evaluation, but
           Gunsan port, a capable port closest to   our client was in urgent situation where  a lady with Korean nationality and of    volume to meet the minimum induce-             22 pkgs
                                                                                     a lady with Korean nationality and of
                Gunsan port, a capable port closest to  our client was in urgent situation where
                the factory to minimize the overall
                                                  they could not delay any longer because
           the factory to minimize the overall   they could not delay any longer because                                               ment or to even wait for another              Max. 141mt
           logistics cost.                   our client was already overdue with    DWT 30,000mt, Crane Capacity 320mt                 satisfactory lady calling at Gunsan port      3,769cbm
                logistics cost.
                                                  our client was already overdue with
                                                                                      DWT 30,000mt, Crane Capacity 320mt
   3   4   5   6   7   8   9   10   11   12   13