arrived at Derince port on June 23rd to   At the point of departure from Pyungtaek   transportation was not to be risked as
          be immediately transferred to two units   port, completion of construction of the   long as cautiously performed. So we
          of River vessels that had been waiting for   access road to Factory was confirma-  eventually concluded the last stage of
          the mother vessel; the transshipment   tively contracted to have been completed   our project..
 The prolonged discussion since the   We received approval from our client to   ing to the lady’s schedule. Because the   completed on 27th. Even though   by the time cargoes arrive, but we only   This marks the celebratory completion
 second half of year 2013 was coming to   handle the entire transport project in   port was congested for a day or two at   demurrage for the daughter vessels’   arrived to find clay road where the   of our project that lasted over an
 an end with agreement to survey the   January 2014. After surveying the whole   the end of every month, we consistently   wait over 7 days piled up, we still made   supposed pavement was to be laid.   extended period of time ---it took up
 local route by end of the year. The subject   transport route from Istanbul, Turkey to   coordinated with the ship-owner to be   fast progression of the transshipment   Calculations and stimulations only   three out of four seasons of a year! It was
 was our memorable Press Machinery   Avtovas GM motor site for the whole   able to call the lady at Pyoungtaek port   procedure, proved by the fact that as   confirmed that continuation from that   a great opportunity to remind ourselves
 Transport Project.  month of February, we went on to obtain   20 days before the commencement of   compared to the minutes of entire   point at during that time meant exposing   the importance of high-level of concen-
 The final place of delivery was in Avtovas,   all the contracts, permits and their   loading procedure in order to prevent any   transport plan, there was still plenty of   the cargoes to great danger. Hence   tration and patience for us to maintain
 Russia, located 9900 nautical miles away   requirements demanded by every   delay.  time remaining. Timely aspect of our   decision was made to resume the   the flow of transport and safety of
 from Korea. Together with necessary   procedure included in the project. Our    The deliberate planning resulted in the   project suggested that our 2nd stage   procedure in October and our staff   subject shipment that transform difficult
 documentation for all transshipments   efforts paid off and we were able to   lady satisfactorily calling at Pyoungtaek   was off to a successful start.   returned to Korea for the mean time.  projects into victories
 and tariffs of the transport, we had to   complete the preparation process in   port at 0500hours on May 12th and all   After waiting for 2 days at Rostov port
 continuously execute inland, ocean,   time for commencement of the project in   cargoes were ready to be lifted by that   ---the gateway to Volga River---, the two   In mid October, our staff returned to the   Max. 207mt
 inland waterway then inland transports   May.  time. So the loading procedure   daughter vessels that departed from   location where the transport would   4,319 cbm
 from Pyoungtaek port in Korea to reach   For the first stage of our transport   commenced at 0800hours on the day of   Derince port on 28th started their voyage   resume and found the access road finally   For Tolyatti, Russia
 the final destination in Avtovas; being   ---loading at Pyoungtaek port--- we   arrival completed at 1700hours on the   to Tolyatti River port which covered 1,200   paved. Though there were some spots in
 continuously alert and maintaining   hired a lady of DWT 30,000mt, crane   May 14th. Then our lady sailed on to the   kilometers and passing of 24 gateways.   unsatisfactory condition and tempera-
 concentration was the core value   capacity 320mt and 640mt combined to   next destination, Derince port, Turkey.  The shipment arrived at Tolyatti River   ture during early morning and night
 necessary to successfully complete the   call on May 10th and in-land transport   port on 10th of July, exactly 58 whole   dropped low to between 4 to 15 Celsius,
 project.  from the jobsite also proceeded accord-  After 40 days of voyage, the shipment   days after departure from Korea.   technical evaluation assured that the