Page 41 - KNT
P. 41
from discharging port to final informed that it was impossible to speed and quality of loading and
destination, Ramos Aripez, Mexico berth at ATP due to the equipment discharging was very favorable and
this year. malfunction for discharging by ATP. satisfactory but stevedoring charge
As a result, we urgently changed at shore side at Altamira was pretty
It takes more than 4 weeks to the jetty to IPA terminal then we higher than other ports.
receive transport permission for could discharge this shipment
heavy lift from Roads and Transport without any problem thanks to
Authority in Mexico so the notice speedy action.
of departure from Dangjin port was
informed to transport company Even loading operation was not our
in Mexico once vessel was started scope, we paid attention at loading
sailing. port to provide high-quality
services as well. Loading operation
In case of this transport, we fully took three and half days and
discussed to berth at Altamira discharging operation at Altamira
Port Terminal (ATP) with them in port took one and half days. The
advance but we were unexpectedly
9

