Page 41 - KNT
P. 41

from discharging port to final       informed that it was impossible to   speed and quality of loading and
       destination, Ramos Aripez, Mexico    berth at ATP due to the equipment    discharging was very favorable and
       this year.                           malfunction for discharging by ATP.   satisfactory but stevedoring charge
                                            As a result, we urgently changed     at shore side at Altamira was pretty
       It takes more than 4 weeks to        the jetty to IPA terminal then we    higher than other ports.
       receive transport permission for     could discharge this shipment
       heavy lift from Roads and Transport   without any problem thanks to

       Authority in Mexico so the notice    speedy action.
       of departure from Dangjin port was
       informed to transport company        Even loading operation was not our

       in Mexico once vessel was started    scope, we paid attention at loading
       sailing.                             port to provide high-quality
                                            services as well. Loading operation
       In case of this transport, we fully   took three and half days and
       discussed to berth at Altamira       discharging operation at Altamira
       Port Terminal (ATP) with them in     port took one and half days. The
       advance but we were unexpectedly

                                                                                                               9
   36   37   38   39   40   41   42   43   44   45   46