Page 119 - 베트남 중고기계설비 수입규정에 관한 정보확산 사업
P. 119
Annex V. Inspection Check List: Technological Line
Annex V.
*OTQFDUJPO $IFDL -JTU 5FDIOPMPHJDBM -JOF
*/41&$5*0/ $)&$,-*45
'PS 6TFE 5FDIOPMPHJDBM -JOFT UP 7JFUOBN
This checklist may be used for all potentially hazardous equipment other than simple and straightforward items.
Manufacturer
Technological Line
I.D No.
Inspection Place
Inspection Date
Inspector Name
3FNBJOJOH $BQBDJUZ PS 1FSGPSNBODFPG 5FDIOPMPHJDBM
-JOFT Y N N/A
Is a production planning, in comprehensible form on specific environmental,
established and managed in a given time period?
Is the production planning well maintained in accordance with the user’s targeted?
Is a production capacity or performance at least 85% of its design
capacity or performance?
5IF "NPVOU PG 3BX .BUFSJBMT PS &OFSHZ $POTVNFE
PG 5FDIOPMPHJDBM -JOFT Y N N/A
Is there a way to manage:
- prevention of excessive heat energy during operation of the
technological line and its composing equipment?
- main equipment if it is working properly without loss of electric energy
when connected to other equipment?
- rated voltage maintained well when electric energy is used for operation?
Is the clamp meter used to check amperage, voltage and resistance of
technological line / each operated equipment?
109

