Page 122 - Equipment Import Regulations of Viet Nam for K-V Investment Promotion
P. 122
2020 K-V Economic Cooperation Work Program
Disseminating Information on Used Machinery and
Equipment Import Regulations of Viet Nam for K-V Investment Promotion
Annex V.
Inspection Check List: Technological Line
INSPECTION CHECKLIST
(For Used Technological Lines to Vietnam)
This checklist may be used for all potentially hazardous equipment other than simple and straightforward items.
Manufacturer
Technological Line
I.D No.
Inspection Place
Inspection Date
Inspector Name
1. Remaining Capacity or Performance of Technological Lines
Y N N/A
Is a production planning, in comprehensible form on specific environmental,
established and managed in a given time period?
Is the production planning well maintained in accordance with the user’s targeted?
Is a production capacity or performance at least 85% of its design
capacity or performance?
2. The Amount of Raw Materials or Energy Consumed of Technological Lines
Y N N/A
Is there a way to manage:
- prevention of excessive heat energy during operation of the
technological line and its composing equipment?
- main equipment if it is working properly without loss of electric energy
when connected to other equipment?
- rated voltage maintained well when electric energy is used for operation?
Is the clamp meter used to check amperage, voltage and resistance of
technological line / each operated equipment?
112

