Page 8 - KNT Cargo Annual Report
P. 8

cargo would be rotating on the  the final positioning of the cargo                                                        03  Transport of Kramo tower & SPMT for 15K Goliath Crane Project
        ship. We had prepared ideas and  took about 24 hours. This task
        engineering materials for girder  was completed safely.
        rotation and consulted with
        ship owners from 2018.The ship  Based on the Singapore project,                                                                                              crane transport. Cargo loaded  requested that some spmt
        owners and masters recognized  our motto is to be a versatile                                                                                                at Goseong port, Korea on 15th  modules were needed in the
        that the idea had no problem  carrier that not only transports                                     ①                                                         March 2019 and they discharged  jobsite so that they had to be
        with the safety of ships and  cranes but also assembles and                                                                                                  at Sembcorp marine shipyard on  discharged at shipyard.
        approved it.                       installs them. Firstly, as we                                                                                             9th April.                         It was very difficult to meet

                                           plan to carry out GRSE crane                                                                                                                                 these demands because all the
        On  April 07, 2019, under  project in 2020, we are going to                                                                                                  2. Spmt trasport                   documents for the cargo were
        the direction of the General  carry out domestic tr ansport,                                                                  ramo Tower 2 Sets and SPMT  Spmt had delivered two round  completed and the departure
        Superintendent, the SPMT worker,  assembly, ocean transport and                                    ②                      Kare required to assemble  trips from Korea to Singapore.             schedule was already set.
        ballasting operator of the ship,  local installation. This experience                                                     a 15,000 ton crane. The Kramo  The first shipment was loaded
        and yard work supervisor became  will enable us to navigate the                                                           Tower is the necessary equipment  with girder on the self-propelling  In addition, the procedure for
        one  and  the  girder  rotation  big goal of being a total logistic                                                       for the crane's erection. Spmt is  barge during the                               dead freight must

        work was carried out. The girder  company that is responsible for                                                         used to move crane components.     15k crane transport                            be very careful and
        turning took about 40 minutes  the transportation, engineering                                                            Knt cargo was responsible for  on  March. After                                   accurate.
        only for turning. Since cargo can  and execution of project cargo.                                                        transporting 15,000ton goliath  discharging Girder                                For dead freight,
        only be operated at high tide,                                                                     ③                      crane as well as 2 set of kramo  on 8th Apr. SPMT                                 if the agreement
                                                                                                                                  tower and SPMT. We send  shipped back to                                          between the owner

                                                                               2 sets of 15,000 ton goliath crane                 transport experts to loading and  Korea on 13th April                             and shipper is not
                                                                               were erected using Kramo tower                     discharging port for all cargo.    at Sembcorp marine                             clear, there is a high
                                                                               at Sembcorp Marin Shipyard.
                                                                                                                                                                     shipyard. It took                              possibility of problems
                                                                                                                                  1. Kramo tower transport           around 10 days to                              in the future.
                                                                                                                                  Kramo Tower's components were  arrive at Mopko
                                                                                                                                  scattered throughout Korea.        port, Korea.                       Due to these problems, the
                                                                                                                                  We brought the components  One month later, in May, spmt  sudden unloading of shippers
                                                                                                                                  to the Masan or Goseong port  was transported from Korea  request may be refused by ship
                                                                                                                                  by tugs & barges and trucks for  to Singapore, and four months  owner or take considerable time

                                                                                                                                  shipment to bulk carriers.         later, it was brought to Korea on  for negotiation.
                                                                                                                                  The ocean transport of the Kramo  September.                          Fortunately, we already sent our
                                                                                                                                  Tower took place two times in                                         staff on site for the shipment of
                                                                                                                                  total.                             It was not difficult to transport  cargo.
                                                                                                                                  The first shipment was shipped  the spmt, so it was expected that  Our staff understood the requests
                                                                                                                                  to the bulk vessel mv hanfeng  there would be no problem.             from customers in the field
                                                                                                                                  at Masan port on 24th February  However, the problem was  and immediately contacted the
                                                                                                                                  2019. The cargo discharged t  caused during the secondary  owners and solved the problem

                                                                                                                                  Sembcorp marine shipyard on  voyage.  In  Singapore,  cargo  in a short time.
                                                                                                                                  10th March 2019.                   loading was completed at noon
                                                                                                                                  The second shipment was  time and ship were scheduled to  And the unloaded spmt was
                                                                                                                                  loaded with girder on the self-    depart in 4 hours.                 shipped to FR container three
                                                                                                                                  propelling barge during the 15k  However, the customer suddenly  months later.