04   Domestic Transport of SRF Heat Supply Facility to Daesan Power






                                                                           requested transportation from client

 ❶ Item: Boiler and Auxiliary                                              from September 2018. From then on,
 ❷  Q’TY: 45Pkgs, 1,000Ton, 9,590.87Cbm
                                                                           we carried out road survey from pick-up
 ❸  Truck on: Pyeongtaek & Ansung factory
                                                                           factory to final destination. In addition,
 ❹ Final destination: Daesan Site
                                                                           we check the transport regulation and
 ❺  Work Scope: FOT Factory to FOT
                                                                           permission of government for oversized
 Jobsite
                                                                           cargo transport. Finally, we found the
 ❻ Period:  2019. 05 ~ 2019. 06
                                                                           best route for the cargo transport.
                                                                           Furthermore, when trucking for
 elcron Group has signed an epc                                            oversized cargo was performed, we
 Wcontract for the Daesan Power                                            took proper preliminary work to prevent
 Solid Waste Fuel (SRF) power plant                                        cargo damage. Generally, the cargo
 in Daesan. Daesan Power SRF Power                                         transported at night time with convoy

 Plant is a renewable energy power
 plant which uses solid waste fuel as its                                  The  storage  yard  of  job site  was
 power source. A steam turbine, which                                      relatively small space so that the arrival
 is incinerated by an average of 510 to                                    schedule of cargo was needed control.
 640 tonnes of SRF per day, will produce                                   Mostly assembly was performed as
 29 megawatts of electricity. This is                                      soon as cargo arrived at jobsite. If
 the largest SRF power plant in Korea.                                     assembly work was delayed and if

 We transported the boiler of power                                        trucks were stand-by at the jobsite,
 generation for this project.                                              the demurrage could be occurred. To
                                                                           cooperate between truckers and jobsite,
 Components listed by the client                                           our head office dispatched expert Ms.
 included a rear wall panel, with                                          Kim, Manager of PTU.
 dimensions of approx..500 cubic meter,
 which required a special handling                                         She said “assembly work schedule in
 during road transport. The cargo                                          job-site was often changed suddenly.
 being too high and large to transport                                     We should also adjust loading

 by normal trailer. It was required the                                    scheme and trucking schedule to
 expertise of our project team who                                         prevent demurrage. It was not easy to
 reviewed the road passage survey with                                     harmonize from truck drivers. But using
 the various options in advance. There                                     our knowledge of large cargo handling
 are a lot of obstacles such as road signs,                                the delivery was completed efficiently
 bridges on the road. Yet we removed                                       and on time to allow the work on the
 some obstacles temporarily and found                                      station to continue on schedule.”

 best route to avoid obstacles.


 Regarding Daesan SRF project, we were