EBOOKNARA · BOOK CONTENT

KNT

We had performed the valuable new business which bring great opportunity for us. We worked together with all our staff and improved our vision.

출처: 이북나라 전자책 『KNT』 2쪽 · 5쪽 · 7쪽 · 10쪽 · 12쪽 · 15쪽

전체 16쪽 · 온라인 플립북

본문에서 살펴볼 내용

본문 2쪽

Contents 01 Introduction 4 - 5 02 Transport of World Biggest Goliath Gantry Cranes Under Preparation 6 - 8 03 Transport of Kramo tower & SPMT for 15K Goliath Crane Project 9 04 Domestic Transport of SRF Heat Supply Facility to Daesan Power 10 - 11 05 Safe Delivery of 5600Ton Press Line to Romania 12 - 13 06 KNT Cargo was ordered a turnkey for 250ton Goliath Crane 14 07 News 15 2 www.kntcargo.co.kr KNT CARGO CO., LTD. 3

출처: 이 전자책 2쪽

본문 5쪽

2 sets of girder were going into dock 01 Introduction at Sembcorp shipyard, Singapore Date : 6th April 2019 I am honored to welcome you to the 6th edition of KNT Cargo’s annual report. 2019 was an intensive and remarkable year for our firm. We had performed the valuable new business which bring great opportunity for us. We worked together with all our staff and improved our vision. It has been 10 years since our company established in 2009. Thanks to the support from our clients and partners, we have grown to become a qualified forwarder and a logistics solution provider.

출처: 이 전자책 5쪽

본문 7쪽

02 Transport of World Biggest Goliath Gantry Cranes Under Preparation Goseong Port was a shallow arrived at Sembcorp shipyard on 2nd shipment ❶ Item: Goliath 15000Ton Crane water basin, so bridge barge 11th February 2019. SPMT was Secondary transport for 2 ❷ Q’TY : 1st shipment: 24Pkgs, (10,000P) were used between used for unloading. The problem girder assemblies was the most 7,404,000Kgs, 59,687.86Cbm the port and the dock. SPMT was was that the edge of the pier important highlight of this 2nd shipment: 2Pkgs, used for loading by Roll-on. Each and the end of ship’s poop deck project.

출처: 이 전자책 7쪽

본문 10쪽

04 Domestic Transport of SRF Heat Supply Facility to Daesan Power requested transportation from client ❶ Item: Boiler and Auxiliary from September 2018. From then on, ❷ Q’TY: 45Pkgs, 1,000Ton, 9,590.87Cbm we carried out road survey from pick-up ❸ Truck on: Pyeongtaek & Ansung factory factory to final destination. In addition, ❹ Final destination: Daesan Site we check the transport regulation and ❺ Work Scope: FOT Factory to FOT permission of government for oversized Jobsite cargo transport. Finally, we found the ❻ Period: 2019. 05 ~ 2019. 06 best route for the cargo transport.

출처: 이 전자책 10쪽

본문 12쪽

05 Safe Delivery of 5600Ton Press Line to Romania the opportunity to prove us to 14th August 2019. Discharging ❶ Hyundai Rotem pitesti be a right solution provider as a took just 3 days and custom 5600Ton XL Press Line logistics specialist. clearance for 2 weeks. In-land ❷ Q’TY: 214Pkgs, 2,151,080Kgs, trucking was commenced from 5,711Cbm In completing a project for 31st August. Finally, all transport ❸ Dangjin, Korea / Constanza, Renault Dasia T/D press line, KNT for the Dasia project until the Romania Cargo proved itself to be the right final destination was completed ❹ Final destination:…

출처: 이 전자책 12쪽

본문 15쪽

06 KNT Cargo was ordered a turnkey for 250ton Goliath Crane 07 News RSE ordered a turnkey to in Korea. It will be shipped River to the GRSE shipyard is ❶ KNT will start new lift large and heavy components, a combination of specialized GSangsang-in ship machinery assembled condition. approximately 100 miles. The business for heavy lifting starting with the GRSE 250Ton equipment KRAMO Tower(Lifting that production, construction, river is quite long and wide.

출처: 이 전자책 15쪽

자주 묻는 질문

이 책의 분량과 형식은 어떻게 되나요?

전체 16쪽 분량의 온라인 플립북입니다. 별도 프로그램을 설치하지 않고 브라우저에서 바로 넘겨 볼 수 있습니다.

이 소개의 내용은 어디에서 가져왔나요?

출처: 이북나라 전자책 『KNT』 2쪽 · 5쪽 · 7쪽 · 10쪽 · 12쪽 · 15쪽. 원문에 없는 주제·저자·발행일은 넣지 않았습니다.

책 전체는 어디에서 읽나요?

이 소개창을 닫으면 원본 전자책으로 돌아갑니다. 본문의 그림과 표, 전체 내용은 전자책에서 확인할 수 있습니다.