                  Meet the Timing



                  with Pre-Carriage







               In case of shipment from China, the                                  176.29/30.00/10.52METERS
               highly important thing for advance   operation at about 1000hrs on 25th   CRANES 3X25MT 2X40MT COMBINED TO
               preparation is that ETA of mother vessel   July.                     70MT
               is timed to arrival time of pre-carriage
               properly.                         On 17th July 2015, before vessel   Performing vessel which has DWT
                                                 berthing, our surveyor contracted by us   32,974mt, crane capacity 25mt*3,
               One of features for inland trucking in   proceeded both equipment measure-  40mt*2 and combined to 70mt got
               China is if there is mistiming between   ment and pre-loading survey at open   alongside at terminal Luojing port of
               arrival time of vessel and pre carriage,   yard of terminal Luojing, Shanghai and   Shanghai at 1600hrs on 24th July and
               there are possibilities to occur disputes   checked that there are not problem to   commenced loading at 2050hrs on 24th
               about surcharge or between concerned   ship them out.                July.
               parties since shipment is loaded onto a
               variety of transportation method from   1. 358MTS/2,505CBM/MAX. WT PER UNIT   Before loading our cargoes, we checked
               several wide-spreading manufacturing   58MTS OF PLANT GOODS
               plants.                                                              other cargo could not be cropped on
                                                 2. SHANGHAI, CHN / PERSIAN GULF    the top of our cargo, secondly all cargo
               In this case, all shipment was fortunately                           should be loaded under deck and lastly
               delivered at loading port prior to 7days   3. PERIOD : END JULY TO END AUG 2015   the lashing/dunnage of our cargo
               before berthing, thanks to cooperation                               should be suitable and satisfactory for
               with supplier in China smoothly.  4. WORK SCOPE : HOOK TO HOOK       sail.
                                                 ON-SHORE
               This shipment was 358mton,                                           All our requests were proceeded accordingly
               2,504.82cbm and max weight per unit   5. VESSEL PERFORMED DURING ON-SHORE   and our client satis ed with our successful
               was 58mton from Shanghai, China to   FLAG ST.VINCENT, BUILT 1986, CLASS BV   service.
               Persian Gulf. Loading operation   GT/NT/DWT 23,275/9,270/32,974MTONS
               commenced at 2050hrs on 24th July   LOA/BM/SUMMER DRAFT