      The nation's largest Ever








        The loading operation of Waste heat   Based on our inspection available, it is of   Increasing to transport modularized
        Boiler was carried out from about 1630   our opinion that the shipments were   cargoes, transportation of enormous
        hours on 16th July 2015 to 0450 hours   stowed and secured to our satisfaction   heavy cargo is on a rising trend. When
        on 17th July 2015 and the loading   and that the transportation was safely   heavy cargo is transported, it has to be
        operation of Stack was carried out from   carried out with the execution of our   fully inspected from the time to design a
        1545 hours to 1730 hours 17th July 2015   recommendation and skillful seaman-  cargo and after completing to manufac-
        and the sea-fastening operation    ship in accordance with the loading/sea-  ture, also the possibilities to transport is
        conducted until 1900 hours on 17th July   fastening/securing/discharging plans for   considered.
        2015.                              the intended voyage..
                                                                              In order to transport this shipment, road
        All sea-fastening materials were in good   1. 3,084MTS/37,165CBM/MAX. WT PER   reinforcement was conducted on the
        condition and considered to be     UNIT 2,980MTS OF PLANT GOODS       shipment route and examination for an
        adequate for the purpose so that none of                              interior wall of port, geological of road
        the cargo will shift during the voyage to   2. PYEONGTAEK, KOR / DONGBANG PIER,   and technical of transport also conducted
        the destination.                   ULSAN PORT, KOR                    prior to 10months. In addition, we had a
                                                                              meeting and implementing safety
        The cargoes arrived at Berth No. 1 of   3. PERIOD : 16TH JULY TO 26TH JULY, 2015  training more than 10 times.
        Dongbang General Pier in Ulsan New
        Port, Ulsan, Korea at about 0715 hours   4. WORK SCOPE : ROLL ON/OFF INC   As a result, we performed successfully
        on 21st July 2015 without any remark-  ON-SHORE                       and were praised by client and related
        able issue during voyage and after                                    companies. Moreover, this project has
        releasing the sea-fastening from the   5. VESSEL PERFORMED DURING     been recorded as the transport for the
        cargoes, and the discharge operation   ON-SHORE FLAG KOREA, BUILT 2007,   nation's largest-ever modularized boiler.
        was commenced from 0914 hours on   CLASS KR LOA/BM/DRAFT DLWL/DWT
        21st to 1000 hours on 22nd July 2015.  129.10/36.00/5.10METERS/17,000MTONS

        Thereafter, the cargoes were inland   6. SPMT PERFORMED DURING ON-SHORE                    The Nation’s Largest
                                                                                                    Waste Heat Boiler
        transported to the construction site of   120 AXLES WITH 4 POWER PACK                         July 2015.
        cargo receiver (SK Gas) from 2335 hours   CONSISTED BY 4 FILES, EACH FILE 30
        on 22nd to 0137 hours on 23rd July 2015   AXLES FOR BOILER 24 AXLES WITH 1
        without any remarkable damage and   POWER PACK FOR STACK
        then the cargoes were unloaded from
        conveyances from 1200 hours to 1750
        hours on 23rd July 2015.