The nation's largest Ever
The loading operation of Waste heat Based on our inspection available, it is of Increasing to transport modularized
Boiler was carried out from about 1630 our opinion that the shipments were cargoes, transportation of enormous
hours on 16th July 2015 to 0450 hours stowed and secured to our satisfaction heavy cargo is on a rising trend. When
on 17th July 2015 and the loading and that the transportation was safely heavy cargo is transported, it has to be
operation of Stack was carried out from carried out with the execution of our fully inspected from the time to design a
1545 hours to 1730 hours 17th July 2015 recommendation and skillful seaman- cargo and after completing to manufac-
and the sea-fastening operation ship in accordance with the loading/sea- ture, also the possibilities to transport is
conducted until 1900 hours on 17th July fastening/securing/discharging plans for considered.
2015. the intended voyage..
In order to transport this shipment, road
All sea-fastening materials were in good 1. 3,084MTS/37,165CBM/MAX. WT PER reinforcement was conducted on the
condition and considered to be UNIT 2,980MTS OF PLANT GOODS shipment route and examination for an
adequate for the purpose so that none of interior wall of port, geological of road
the cargo will shift during the voyage to 2. PYEONGTAEK, KOR / DONGBANG PIER, and technical of transport also conducted
the destination. ULSAN PORT, KOR prior to 10months. In addition, we had a
meeting and implementing safety
The cargoes arrived at Berth No. 1 of 3. PERIOD : 16TH JULY TO 26TH JULY, 2015 training more than 10 times.
Dongbang General Pier in Ulsan New
Port, Ulsan, Korea at about 0715 hours 4. WORK SCOPE : ROLL ON/OFF INC As a result, we performed successfully
on 21st July 2015 without any remark- ON-SHORE and were praised by client and related
able issue during voyage and after companies. Moreover, this project has
releasing the sea-fastening from the 5. VESSEL PERFORMED DURING been recorded as the transport for the
cargoes, and the discharge operation ON-SHORE FLAG KOREA, BUILT 2007, nation's largest-ever modularized boiler.
was commenced from 0914 hours on CLASS KR LOA/BM/DRAFT DLWL/DWT
21st to 1000 hours on 22nd July 2015. 129.10/36.00/5.10METERS/17,000MTONS
Thereafter, the cargoes were inland 6. SPMT PERFORMED DURING ON-SHORE The Nation’s Largest
Waste Heat Boiler
transported to the construction site of 120 AXLES WITH 4 POWER PACK July 2015.
cargo receiver (SK Gas) from 2335 hours CONSISTED BY 4 FILES, EACH FILE 30
on 22nd to 0137 hours on 23rd July 2015 AXLES FOR BOILER 24 AXLES WITH 1
without any remarkable damage and POWER PACK FOR STACK
then the cargoes were unloaded from
conveyances from 1200 hours to 1750
hours on 23rd July 2015.