03 :   KNT Cargo with Challenging Operation


                    of Boiler Plants Delivery







          Qeshm Island is located a few
        kilometers off the southern coast of

        Iran (Persian Gulf), opposite the port
        cities of Bandar Abbas and Bandar
        Khamir. The island, which hosts a
        300-square-kilometre free zone

        jurisdiction, is 135 km long, and lies
        strategically in the Strait of Hormuz,
        just 60 kilometres from the Omani
        port of Khasab, and about 180

        kilometres from the UAE Port Rashid.


           Transport of a large industrial
        boiler can be quite challenging.
        Large dimensions and heavy weight
        pose unique requirements to ensure

        safe and efficient transport.


          KNT Cargo was awarded the
        contract to transport power
                                             SPMT (Self Propelled Modular Trailer).   Since US sanctions on Iran were
        generating equipment and its
                                                                                  to be recovered from Nov. 05, time
        accessories with the largest unit
                                               The main body were picked up       deadline was another risk factor we
        weighing up to 90 tons as part of
                                             from factory in Kunsan, Korea and    should challenge as well. Clients
        Qeshm Project.
                                             moved by SPMT to Kunjang new         also carefully checked and got a
                                             port of Kunsan, where they were
          Due to oversized dimension and                                          loading permission in advance from
                                             loaded aboard a vessel for onward
        heavy weight, the main body was                                           government before shipments.
                                             transport to Qeshm. Part of cargoes
        manufactured in the factory adjacent
                                             made a short journey to shipside for   Since the first shipment in February
        to loading port. This meant that even
                                             loading and at the same time two     2018 up to the final delivery of the
        special trailer could not be used to
                                             vessel cranes were positioned for    third shipment in November 2018,
        travel the entire route directly from
                                             lift. All necessary slings and shackles   KNT Cargo has efficiently run the
        factory to port, and the only suitable
                                             were attached to the cargoes and     operation processes.
        type of transport solution, which was
                                             the lift began. The cranes lifted the
        able to carry such a heavy load along
                                             cargoes over the fence and placed
        a few kilometers to port, was an
                                             them below deck on the vessel.