For the safe and successful transport of special cargoes, a
                                                              very clear view and good knowledge of the route that it will
                                                              follow is definitely very important.  The constant change of
                                                              the outdoors conditions as well as the uniqueness of each
                                                              cargo, require each time a complete route survey in order
                                                              to decide whether the transport is possible and under what
                                                              particular circumstances.
                                                              Traffic signs and traffic lights are being removed prior to the
                                                              transport….







                                                              Main boiler is being moved on to barge on SPMT. Slow! Slow!
                                                              Safely!



                                                              Project summary
                                                              1.  Main Boiler 19.20M(L) x 12.50M(W) x 15.60M(H), 470 tons,,

                                                                3744.00 cbm
                                                                Stack Pipes 40.00M(L) x 4.70M(W) x 4.70M(H), 42 tons,
                                                                883.60 cbm
                                                              2. Kunsan factory / Unlsan factory
                                                              3. Period : 2018.10




       the giant cargoes 8.6km on public roads, permits were    Upon arrival at the final port, careful precision was
       required, therefore a route survey was carried out     required to maneuver the SPMT through the narrow gates
       beforehand to identify all obstacles and street furniture,   into installation site. Final leg of the journey was ahead

       such as traffic signs and traffic lights, that had to be   of us. Extreme care had to be delivered to place cargoes
       removed prior to the transport.                        onto the foundation support beam for which margin of
                                                              error allowed SPMT only 5cm.
        Stack pipes measured 40m(L) x 4.7m(W) x 4.7m(H) and
       weighed 42 tons. Upon arrival at second port, Yoolchon,   Although it was a challenging and gruelling enterprise,
       cargoes were transported out of factory for loading. SPMT   everything came together successfully and the consignee
       solution was also selected using single 14 axle line.  was impressed with the care and precision that resulted in

                                                              the safe delivery of their equipment.
        Safety considerations necessitated speeds as low as
       possible and the transporter made several stops on
       descents to allow for the cooling and inspection of axles
       and brakes.