Page 110 - KNT
P. 110

06  KNT Cargo was ordered a turnkey for 250ton Goliath Crane                                                                                                                                                     07  News






             RSE ordered a turnkey to  in  Korea. It will  be  shipped  River to the GRSE shipyard is                             ❶  KNT will start new  lift large and heavy components,  a combination of specialized

        GSangsang-in ship machinery  assembled condition.                     approximately 100 miles. The                        business for heavy lifting  starting with the GRSE 250Ton  equipment KRAMO Tower(Lifting
        that production, construction,                                        river is quite long and wide.                       field in 2020                      Goliath Crane project in India,  Capacity 6,500Ton) and in-
        engineering and transportation for  For this project, we visited India                                                    From 2020, KNT will move           KNT can provide you with  depth, sector-specific engineering
        one-unit of 250ton Goliath crane.  twice to meet with GRSE and  The work schedule will begin                              forward as a total logistics       the equipment, expertise and  experience, KNT can helps clients
                                           KoPT(Kolkata port trust). There is  assembling cranes in August,                       company that performs not          experience to work safely and  benefit from greater safety and
        In this project, we are responsible  a ship’s width limitation problem  and will begin shipping by mid-                   only  sea  transportation  but     efficiently.                       efficiency.
        for the transportation, assembly,  for sailing the Hoogly River,  September and will complete                             also engineering, erection and     KNT's heavy lifting services
        loading, sea transport, unloading  but we are going to solve the  installation at the end of October.                     dismantling of cranes and large    can support clients in every
        and installation. The crane will be  problem. The voyage distance  Now, we will start the project as                      structures. Where you need to      major industrial sector. With

        assembled at the Orient Shipyard  from the entrance of the Hugley  a total logistics company.



















                                                                                                                                  ❷ Promotion news

                                                                                                                                  Manager Kim Jin-ha joined the company in 2011
                                                                                                                                  and was promoted from Assistant Manager
                                                                                                                                  to Manager as a member of the Multimodal
                                                                                                                                  Transportation Team. She is responsible for domestic

                                                                                                                                  projects and overseas shipping. Hee-tae Lyu joined
                                                                      1.3.2  After Flat Bar Reinforcement
                                                                       Equivalent Stress : 190.22 MPa < Allowable Stress 241.26 MPa
                                                                                                                                  the company in 2016 and was promoted from
                                                                                                                                  Assistant Manager to Manager in Project team. He

                                                                                                                                  is responsible for shipping overseas projects.
























        14  www.kntcargo.co.kr                                                                                                                                                                                        KNT CARGO CO., LTD.  15
   105   106   107   108   109   110   111   112