cargo would be rotating on the  the final positioning of the cargo   03  Transport of Kramo tower & SPMT for 15K Goliath Crane Project
 ship. We had prepared ideas and  took about 24 hours. This task
 engineering materials for girder  was completed safely.
 rotation and consulted with
 ship owners from 2018.The ship  Based on the Singapore project,   crane transport. Cargo loaded  requested that some spmt
 owners and masters recognized  our motto is to be a versatile   at Goseong port, Korea on 15th  modules were needed in the
 that the idea had no problem  carrier that not only transports   ①  March 2019 and they discharged  jobsite so that they had to be
 with the safety of ships and  cranes but also assembles and   at Sembcorp marine shipyard on  discharged at shipyard.
 approved it.  installs them. Firstly, as we   9th April.                        It was very difficult to meet

 plan to carry out GRSE crane                                                    these demands because all the
 On  April 07, 2019, under  project in 2020, we are going to   2. Spmt trasport  documents for the cargo were
 the direction of the General  carry out domestic tr ansport,   ramo Tower 2 Sets and SPMT  Spmt had delivered two round  completed and the departure
 Superintendent, the SPMT worker,  assembly, ocean transport and   ②  Kare required to assemble  trips from Korea to Singapore.  schedule was already set.
 ballasting operator of the ship,  local installation. This experience   a 15,000 ton crane. The Kramo  The first shipment was loaded
 and yard work supervisor became  will enable us to navigate the   Tower is the necessary equipment  with girder on the self-propelling  In addition, the procedure for
 one  and  the  girder  rotation  big goal of being a total logistic   for the crane's erection. Spmt is  barge during the   dead freight must

 work was carried out. The girder  company that is responsible for   used to move crane components.  15k crane transport   be very careful and
 turning took about 40 minutes  the transportation, engineering   Knt cargo was responsible for  on  March. After   accurate.
 only for turning. Since cargo can  and execution of project cargo.   transporting 15,000ton goliath  discharging Girder   For dead freight,
 only be operated at high tide,   ③  crane as well as 2 set of kramo  on 8th Apr. SPMT       if the agreement
           tower and SPMT. We send  shipped back to                                          between the owner

 2 sets of 15,000 ton goliath crane   transport experts to loading and  Korea on 13th April   and shipper is not
 were erected using Kramo tower   discharging port for all cargo.  at Sembcorp marine        clear, there is a high
 at Sembcorp Marin Shipyard.
                                              shipyard. It took                              possibility of problems
           1. Kramo tower transport           around 10 days to                              in the future.
           Kramo Tower's components were  arrive at Mopko
           scattered throughout Korea.        port, Korea.                       Due to these problems, the
           We brought the components  One month later, in May, spmt  sudden unloading of shippers
           to the Masan or Goseong port  was transported from Korea  request may be refused by ship
           by tugs & barges and trucks for  to Singapore, and four months  owner or take considerable time

           shipment to bulk carriers.         later, it was brought to Korea on  for negotiation.
           The ocean transport of the Kramo  September.                          Fortunately, we already sent our
           Tower took place two times in                                         staff on site for the shipment of
           total.                             It was not difficult to transport  cargo.
           The first shipment was shipped  the spmt, so it was expected that  Our staff understood the requests
           to the bulk vessel mv hanfeng  there would be no problem.             from customers in the field
           at Masan port on 24th February  However, the problem was  and immediately contacted the
           2019. The cargo discharged t  caused during the secondary  owners and solved the problem

           Sembcorp marine shipyard on  voyage.  In  Singapore,  cargo  in a short time.
           10th March 2019.                   loading was completed at noon
           The second shipment was  time and ship were scheduled to  And the unloaded spmt was
           loaded with girder on the self-    depart in 4 hours.                 shipped to FR container three
           propelling barge during the 15k  However, the customer suddenly  months later.