The Arabian Peninsula sits at the   KNT Cargo had been involved in an    At the same time, the rope with a
       heart of a market of around         ongoing project for our long time    diameter of 1cm was put around
       1.7 billion people, covering the    client, over the last several months.   each pipe to protect any contact
       Middle East, Indian Subcontinent    The project, which was completed in   among pipes.

       and Africa. A combination of rapid   the middle of June, consisted of
       population growth, increasing       7 lots of different kinds of CWC     All of the cargo was safely loaded
       consumer awareness and high oil     such as concrete weight coating      and secured without significant
       prices mean that this is a booming   pipes. To plan appropriately for    delays and responsibility was
       market for fast moving consumer     transport of CWC, KNT Cargo visited  accepted by the ship’s Chief
       products.                           the locations and drafted a detailed   Officer for transport to port of
                                           load-out plan in conjunction with    Shuaiba, Kuwait.

       At the same time, many parts of     manufacturer. The biggest challenge
       this region are re-emerging after   during the project was maintaining   Upon arrival at the Port of Shuaiba
       long periods of war and political   the quality of the cargoes.          of Kuwait, Mr.Cho, the general
       isolation. These countries are      Since the cargoes are sensitive to   manager and KNT’s representative
       hungry not only for the consumer    damage and large number of lifting   in Iran office supervised the
       products that were previously       operations occurred, the protection   unloading for any damage.
       denied to them, but also for the    of cargo quality was the first       Finally the job was completed with
       building materials and medicines    priority.                            satisfaction to all parties concerned.
       required for their reconstruction.

                                           The space between cargo and
       KNT Cargo caters to distribution,   deck has to be enlarged or at least   1. VOLUME :  70,187.90MTS, 7,367PKGS,
       purchasing and warehouse managers  great care must be taken to ensure               63,491CBM,
       in need of logistics services,      that the cargo does not under any               11.40TON(MAX WEIGHT)
       as well as the numerous companies   circumstances come into contact      2. POL/POD :  PYEONGTAEK, KOREA /
       whose business is the transportation  with the deck over which sweat                 SHUAIBA, KUWAIT
       of goods. KNT Cargo covers all      may flow. The Wooden dunnage         3. PERIOD : 2016.12 ~ 2017.06

       aspects of the logistics industry,   and carpet were used to cover       4. WORKSCOPE :  FROM UNDER HOOK
       including warehousing and           the underdeck floor on which                        PYEONGTAEK TO FOT
       transport.                          the cargoes were placed.                            SHUAIBA, KUWAIT